About the Project

 

WHAT IS THE FM DIVERSION?

The Diversion Project is a 20,000 cubic feet per second, 36-mile long, 1,500 foot-wide diversion channel with 32,500 acres of upstream staging.

  • This plan was chosen after years of diligent study, public input and joint cooperation between the city of Fargo; the city of Moorhead; Cass County, North Dakota; Clay County, Minnesota; the Joint Cass Water Resource District; and the Buffalo-Red River Watershed District.
  • The FM Diversion would reduce a 100-year flood event from 42.4 feet to 35 feet at the Fargo gage. For reference, the 2009 flood of record peaked at 40.8 feet.
  • Though not designed to prevent a 500-year flood event, the FM Diversion would give the area a chance by reducing the river level in Fargo from 46.7 feet to 40 feet during a 500-year event.
  • The plan includes 150,000 acre-feet of upstream staging. The staging area would only be used for flood events exceeding a 10-year event, or a 35-foot event in Fargo.

 

HOW IS IT PAID FOR?

  • The total cost of the project is roughly $1.8 billion.
    • $800 million (45 percent) is the federal share.
    • The remainder, approximately $1 billion (55 percent), is the non-federal share.
    • Minnesota is estimated to cover 10 percent of the non-federal share. ($100 million)
    • North Dakota is estimated to cover 90 percent of the non-federal share. ($900 million)
    • It is being requested that the state and the local split the non-federal, non-Minnesota share 50/50.  ($450 million each)

     

  • To date, North Dakota has approved $175 million.
  • The citizens of Fargo and Cass County have both passed sales tax increases that have been dedicated to help fund the local share. These are each expected to raise $700 million over the life of the tax.

 

READ WHY THE DIVERSION IS NEEDED HERE.

 

This description of the Fargo-Moorhead (FM) Area Diversion Project focuses on the recommended Federal plan (also known as the Locally Preferred Plan). For full details, read the Final Feasibility Report and Environmental Impact Statement, July 2011. (Large download)

 

Woman Wondering

The Need for the ProjectLearn why the Fargo Moorhead Diversion is critically needed. Click Here

   
Project History Project History Learn about how this project came about. Click Here
   
Two Men Shaking Hands MitigationLearn about Project Mitigation. Click Here
   
Frequently Asked Questions Frequently Asked QuestionsFind answers to commonly asked questions and learn about common misconceptions about the project. Click Here

 

Contact Us Disclaimer Privacy Statement Site Map
Copyright © 2014 Diversion Authority
All Rights Reserved