Awarded Work Packages

Project NumberProject NameScope DescriptionPrime ContractorEstimated Finish DateAmount AwardedAward Date
42A.1/A.3In‐Town Levees 2nd Street / Downtown Area (4th St. Pump Station)Replace existing 4th Street pump station, gatewell structure, backup power generator, outfall structure; modifications for the existing 4th Street levee; construction of floodwall; and reconstruction of 2nd Street South and other associated components. Industrial Contract Services Inc.Summer 2017$17.8 M2014 - November
42F.1NFlood Control, 2nd Street North, North of Pump Station (Floodwall North)Construction of a concrete floodwall, road realignment, retaining wall, removable crossing at 4th Avenue North, utility relocations, and other associated components. Industrial Builders Inc.Spring 2016$13 M2016 - April
42F.1SFlood Control, 2nd Street North, South of Pump Station (Floodwall South)Demolition of 4 residential homes, constructing earthen levee, modification and replacement of storm sewer, modifications to sanitary sewer and water main, and paving.Industrial Builders Inc.Fall 2016$16 M2015 - July
42F.2Flood Control, 2nd Street SouthConstruction of a concrete floodwall, earthen levee, utility installations, and modifications to 2nd Street South.Houge Inc.Fall 2016$1.4 M2016 - June
42H.2El Zagal Area Flood Risk Management (El Zagal)Constructing earthen levee and flood wall, floodwall closure, Gatewell, 8 residential demolitions with landscape removal, Sanitary Lift Station, Storm Sewer, Sanitary Sewer, and other components.ReinerFall 2016$1.5 M2016 - January
42I.1Mickelson Levee Extension(Mickelson)Demolition of 4 residential homes, constructing earthen levee, modification and replacement of storm sewer, modifications to sanitary sewer and water main, and paving.Industrial Builders Inc.Fall 2016$.7 M2016 - February
43E.2DDemolition, Schnell Drive and Riverbend RoadDemolition or relocation of 11 residential homes in Oxbow, ND, including Utility and landscaping removals and excavation backfilling.Schmidt and Son's Construction Inc. of Kindred, NDSummer 2017$.139 M2016 - December

Future Work Packages

Project NumberProject NameScope DescirptionEstimated ValueEstimated IFB date
43E.2EOxbow Residential Demolitions IIDemolition or relocation of residential homes and golf clubhouse in Oxbow, ND, including utility and landscaping removals and excavation backfilling.$725kApril 2017
43E.3Oxbow Park RelocationRemove existing Oxbow City Park and construct a new Oxbow City Park$670KMarch 2017
42GLandscapingLandscape the areas that are included in Projects 42A.1/A.3, 42F.1N, 42F.1S, 42F.2, 42H.2, and 42 I.1.TBDMarch 2017
43E.2FOxbow Residential Demolitions IIIDemolition or relocation of additional residential homes in Oxbow, ND, including utility and landscaping removals and excavation backfilling.$490kApril 2017