Supplemental Draft Feasibility Report and Environmental Impact Statement
April 2011
Consultant's Report
Fargo-Moorhead
Metropolitan Area Flood Risk Management
(Back to FEIS Main Page)
(Note: some documents are large. They might take some time to download.)
Consultant's Report
Volume 1: Feasibility Study - Phase 4: General Report
Volume 2: Feasibility Study - Phase 4: Appendix A Cover Letter
Volume 2: Appendix A - Hydrology: Executive Summary
Volume 2: Appendix A - 1b: Hydrology
Volume 2: Appendix A - 1c: Hydrology
Volume 2: Appendix A-2: Hydrology
Volume 2: Appendix A-3: Hydrology
Volume 2: Appendix A-4a: Hydrology
Volume 2: Appendix A-4b: Hydrology
Volume 3: Feasibility Study - Phase 4: Appendices B-E Cover Letter
Volume 3: Appendix B - Hydraulics Existing Condition
Volume 3: Appendix C - Hydraulics With Project Conditions
Volume 3: Appendix D - Civil and Geotechnical Design
Volume 3: Appendix E - Bridge Structures
Volume 4: Feasibility Study - Phase 4: Appendix F Cover Letter
Volume 4: Appendix F - Hydraulic Structures
Volume 4: Appendix F - Hydraulic Structures: Exhibit A - Background Hydrologic Information
Volume 4: Exhibit Q - Control Structure Computations
Volume 4: Exhibit R - Aqueduct Computations
Volume 5: Appendix G
|