FM Diversion – Fargo Moorhead Area Diversion Project

Studies, Technical and Organizational Documents

Corps of Engineers Documents

Environmental Impact Statement
Fargo-Moorhead Metropolitan Area Flood Risk Management

In-Town Levees

Organizational Documents

Other Projects and Environmental Assessments

 

If a document is not posted on this website but should be made available, please message us via the Contact Us page to make a request.

Agreements and MOU

Corps of Engineers/FEMA Documents

Fargo-Moorhead Final FEMA/USACE Coordination Plan

Mitigation Plan

Financial

Land Acquisition

Utility Relocation

Project Refinements

Agricultural Risk Management

Cemetery Impacts

Cemetery Mitigation Plan

Cemetery Study Note: large downloads

Additional Documents

Studies

Inundation Reports

October 2012 Inundation Reports

Note: large downloads

The information, maps, and tables presented in these reports are based on analysis completed in September, 2012, which includes the proposed changes to the Feasibility Study alignment called the “Preferred Alternative.” The Preferred Alternative includes the VE13-Option A alignment (located approximately 1 mile north of the Feasibility Study alignment), allowing more flows through town, and adding gates to the Inlet Structure.

February and March 2012 Inundation Reports

Oxbow-Hickson-Bakke Levee Project

Permits

Post-Feasibility Reports

Cultural Survey Reports (Available by Request)

The following cultural survey reports needed for specific purposes may be available by request by e-mailing Terry Williams, Corps of Engineers Project Manager, at terryl.l.williams@usace.army.mil

  • Dolin, Melissa M. 2014. Final Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of 2014 Phase I Cultural Resources Investigations for the Wild Rice Dam Fish Passage Mitigation Project. Prepared for the Diversion Authority and the USACE. August 29, 2014.
  • Ferris, Kade M. 2011. A Traditional Cultural Property Survey of the Fargo-Moorhead Metro Area Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota. Prepared for the City of Fargo and the USACE, St. Paul. August 29, 2011.
  • Jones, Rhiannon, Katherine Shillinglaw. 2013. Archaeological Testing To Verify A Reported Grave Site (32CSC362) at the Sheyenne River Crossing of the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota. Prepared for the USACE, St. Paul. October 2013.
  • Jones, R., et. al. 2013. Report of Investigation 811: Phase II Evaluation of Archeological Sites 32SC0201 & 32SCX384 Reaches 1 and 4, of the Fargo-Moorhead Metro Flood Risk Management Diversion Channel Alignment, Cass County, North Dakota. Prepared for the USACE, St. Paul. March 2013.
  • Jones, R., et. al. 2014. Phase II Evaluation of Thirteen Archeological Sites Fargo-Moorhead Metro Flood Risk Management Diversion Channel Alignment, Cass County, North Dakota. Prepared for the USACE, St. Paul. March 2014.
  • McCarthy, Melinda M. 2015a. The Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of Phase I Cultural Resources Investigations at 32CS4278, 32CS4292, 32CS4294, 32CS4296, 32CS4298, and 32CS4300 for the Mickelson Field Levee Extension Phase I. Prepared for the Diversion Authority and USACE, St. Paul. June 2015.
  • McCarthy, Melinda M. 2015b. The Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of Phase I Cultural Resources Investigations for the Mickelson Field Levee Extension—Indirect APE. Prepared for the Diversion Authority and USACE, St. Paul. July 2015.
  • McCarthy, Melinda M., et. al. 2014. Final Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota: Results of 2013-2014 Phase I Cultural Resources Investigations for the In-Town Levee and Floodwall, El Zagal Phase 2, and Reaches 1-6 of the North Dakota Diversion. Prepared for the Diversion Authority and USACE, St. Paul. November 17, 2014.
  • Meier, Marcia, et. al. 2013. Final Report: The Fargo-Moorhead Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota: Results Phase I Cultural Resources Investigations, 2012. Prepared for the Diversion Authority and USACE, St. Paul. July 2013.
  • Meier, Marcia, et. al. 2014. Draft Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of 2013 Phase I Cultural Resources Investigations for the Oxbow-Hickson-Bakke Ring Levee. Prepared for the Diversion Authority and USACE, St. Paul. March 2014.

 

If a document is not posted on this website but should be made available, please message us via the Contact Us page to make a request.